New demo room in Roggwil
Construction of the new show room at the SCHNEEBERGER headquarters started in 2017. It has now been commissioned in 2018.
The new, well-lit space fits seamlessly into the existing company building. The 400 m2 exhibition area is now able to present the newest generation of our grinding machines. The new space will also be used for customer training and application development. The base plate was generously designed to carry the heavyweights from our machine range, as well.
The most modern cooling, heating, and air cleaning technology combined with LED light installation ensures a pleasant environment.
To supply the machines installed in the demo room with cooling lubricants, power, and compressed air, 12 pumps with 24 connection spaces including power boxes and supply tubes were installed. 230 volt power and LAN outlets are also integrated in the GIFAS boxes.
Categories
All posts
- EMO 2025 - Thank you very much for visiting SCHNEEBERGER.
- EMO NEWS 4/4: The latest generation of SCHNEEBERGER steady rests gives the Aries NGP additional production stability
- EMO NEWS 3/4: SCHNEEBERGER profiles Top Notch inserts in new cartridge clamping system
- EMO NEWS 2/4: Norma NGC 750 grinds geometrically complex compressor screws with high precision
- EMO NEWS 1/4: SCHNEEBERGER celebrates the world premiere of the latest generation of Gemini NGM TAP
